Snêk

The cabinet with Pelly pull-out system is assembled according to the same principle as “CABINETS”.

Open the drawer with the Pelly pull-out system and read the installation instructions.

Install the supplied drawer runners on the right and left sides of the cabinet. Only one hole is pre-drilled in the cabinet for the system screw; the other two holes must be drilled during installation. Use a 4.5 mm drill bit. A routed line in the cabinet side is provided to assist with horizontal drilling.

Install the Pelly guide block into the pre-drilled holes in the bottom panel.

Assemble the side panels to the bottom panel using 4 wood screws, 4.0 × 35 mm.

Attach two (or four, if space allows) plinth legs using 4.0 × 40 mm wood screws. For inset plinths with a lip, the plinth legs must be positioned 90 mm from the front edge (measured without the frame).

Install the back panel, ensuring that it is pressed fully down into the groove in the bottom panel.

Install the top rails at the back and front edges. Use 4.0 × 35 mm wood screws (4 screws per rail).

Fasten the frame clips using 3.5 × 15 mm pan head screws (1 screw per frame clip).

Note: New drill template – read “DRILL TEMPLATE” before installation.

Install the wall rail onto the wall. Use wood screws of a suitable length depending on the wall material (screws not included).

Attach the mounting rail to the back of the cabinet using 4.5 × 25 mm wood screws (2 pcs).

Attach the frames to the cabinet.

Assemble the Pelly pull-out system with the shelves at the desired height according to the manufacturer’s installation instructions.

Fasten the mounting brackets into the pre-drilled holes on the back of the front panel and attach the Pelly pull-out system.

Install the pull-out unit into the cabinet and fine-adjust the front position according to the adjustment instructions provided by the manufacturer.